All model railroads involve tradeoffs. The supposed logic for smaller setups is that we trade size for detail. So while I'm running five cars trains instead of 50 car lineups, I can take the time to detail the scene to the Nth degree. But as I've mentioned numerous times before, I'm lazy. For me the … Continue reading Watching Paint Dry
Tag: flextrack
Filling Gaps
If you take a good look at the plan for The Hills Line, you'll see the oft-mentioned segments that make up the layout. Joining them together is a set of custom built lift-out sections assembled from whatever scraps were left over from benchwork construction. Since the sections are supposed to represented unmodeled portions of the … Continue reading Filling Gaps
Gandy Dancing: Bridges
The last portions of track to lay on The Hills Line are for the variety of bridges on the layout. In the past I would cut in standalone bridge track where appropriate, but this time I wanted to try to integrate the flex track directly into the bridge decking. That way I avoided the inevitable … Continue reading Gandy Dancing: Bridges
Gandy Dancing: Flex Track
What is it about laying track that causes us to pull out every tool we own to get the job done? I have no doubt that the visual carnage currently present on top of my layout has been repeated in countless basements time and time again. Despite the feeling that a small bomb has been … Continue reading Gandy Dancing: Flex Track