The three most important things a railroad right-of-way needs are drainage, drainage, and drainage. Excess water in the railroad infrastructure decreases, degrades, and ultimately destroys tracks, ties, and turnouts. On The Hills Line, I've not modeled lineside ditches. Instead, the track is laid directly on the foam board sub-roadbed to replicate the not-as-high-speed-as-the-main look present … Continue reading Drainage

